RT @kryanjames: The issue of “why" for the rolling blackouts in Arkansas notwithstanding, @ArkansasPSC should at least require energy compa…
@cooper4senate
@cooper4senate · — · —
Voice fingerprint
Percentage-point difference between this legislator’s topic share and the party median. Bars left are under-indexed; bars right are over-indexed.
Most distinctive Energy 1.4 pp above the party median
- Topics
- 1
- Over
- 1
- Under
- 0
Voice fingerprint. 1 topics shown on a symmetric scale from −1.4 pp to +1.4 pp. Most distinctive topic: Energy, 1.4 pp above the party median.
- Energy Over-indexed +1.4 pp
Bars share a symmetric scale of ±1.4 pp.
View complete comparison table
| Topic | Legislator share | Party median | Difference | Direction | Posts |
|---|---|---|---|---|---|
| Energy | 2.1% | 0.8% | +1.4 pp | Over-indexed | 12 |
@cooper4senate's interaction network
Explore parsed retweets and mentions linked to known legislators and external handles. Filter by direction, topic, target party, target state, or interaction type.
Post explorer
Switch between this legislator's most-engaged posts, newest posts, and representative samples.
- 4 matching posts
RT @kryanjames: @cooper4senate @ArkansasPSC @MISO_energy I am of the opinion that if an out-of-state broker has the time to send a “recomme…
@kryanjames @ArkansasPSC @MISO_energy And how long should these notifications be? Their primary obligation is to protect the grid. The moment load exceeds generation capacity, the remainder of the generators shut down and the grid fails. Time permitting, yes but lots of times not possible.
@kryanjames @ArkansasPSC @MISO_energy Safety is what shedding load is all about. Seconds count when load is nearing the generation capacity. Failure means very long restart times.